1981 CESSNA CITATION II
| Precio solicitado | $1,950,000 |
|---|---|
| Ubicación | Houston, Texas |
| Seller | Prime Aircraft, LLC |
| Visto por primera vez | 2026-04-04 |
| Actualizado | 2026-08-21 |
Especificaciones
Célula
| Año | 1981 |
|---|---|
| Matrícula | N862K |
| N.º de serie | 550-0257 |
| Tiempo total | 12,575 h |
Descripción
MAJOR PRICE REDUCTION - Super nice Citation Super II with Williams FJ44-3A engines with only 315.7 since overhaul, with Jettech STC for dual Garmin G700TXi's and dual Garmin GTN750Xi's. Has extra wide main entry door. Has Branson extended range tank (120 Gallons) installed by Sierra Industries. Up to 6 hours of range at 400 knots at 41,000 feet. Based at Sugar Land, Texas, a suburb of Houston. This aircraft was initially placed on the Mexican registry from 1981 until 1996. During the time in Mexico it was maintained at Citation Service Centers or at factory authorized facilities. The engine and cabin door modification was done by Sierra industries in 2008. Was in France from 2017 to 2018. In 2018 the current owner purchased the aircraft in France with a pre-purchase inspection at the Citation Service Center in France and then had the aircraft fully refurbished in the US with new paint, interior and avionics upgrades.
Aviónica y equipamiento
Dual Garmin G700TXi Primary Flight Displays
Dual Garmin GDC-7400 Air Data Computers
Dual Garmin GTX3000 Transponders
Dual Garmin GTN750Xi's Nav/Com/GPS (WAAS/LPV)
Garmin GDL 69A (XM Receiver)
Garmin GAD 42 Interface Adapter
Garmin GAD 43E Enhance Autopilot Interface
Garmin GRS-79 AHRS
Garmin GMU-44 Magnetometer
WX500 Stormscope
Garmin GDL 88 Data Link (ADS-B "Out")
Garmin 35c remote Audio Panel
Dual Mid-Continent MD-302 Standby Attitude Modules
Garmin GWX75 Color Weather Radar
Honeywell TPU67A TCAS II w/ Change 7.1
Wiring installed for Single-Pilot Operation
Kannad 406AF 406MHz ELT
Honeywell Mark VIII EGPWS
Garmin GTP 59 OAT Probe Kit
Fairchild GA100 CVR
CD 125 Command Display
Estado de inspección
Phase 1 complied with 7/2025 (24 month/300 hours)
Phase 2 complied with 7/2025 (24 month/300 hours)
Phase 3 complied with 7/2025 (24 month/300 hours)
Phase 4 complied with 7//2025 (24 month/300 hours)
Phase 5 complied with 1/2024 (36 month/1200 hours)